89°
Mostly sunny
SUN
 87°
 53°
MON
 90°
 58°
TUE
 82°
 56°
WED
 78°
 56°
THU
 79°
 53°

Last hours to vote for the Best of Sonoma County finalists! Don't miss out!

City could turn wastewater into energy

In an effort to turn garbage into gold, the City of Petaluma is exploring ways to convert the wastewater generated by its industrial users into energy.

Just five months after several local food processors said they could no longer afford Petaluma's wastewater costs, the city has hired an outside consultant to study the sewer plant's capacity and efficiency. The ultimate goal: Retrofit the facility to accept high-density waste from industrial users and turn it into electricity that the city can use to offset energy costs.

Kennedy Jenks Consultants — a Santa Rosa-based firm that built the original Petaluma Hopper Street wastewater plant in 1930 — is tasked with assessing the ability of the Ellis Creek Wastewater Treatment Facility to accept the thick, sludgy waste that food and beer producers generate. There is a growing number of such businesses in Petaluma. Kennedy Jenks will also oversee a $4.5 million required upgrade to the plant's equipment to meet higher state water quality standards.

Public Works Director Dan St. John said that the firm's final report to the city will include a proposal to create a methane digester that turns waste into energy.

“It's state of the art technology,” said St. John. “It encourages the food and beer industries to stay in Petaluma, but to do so in the environmentally friendly way that reflects this city's long-term goals.”

News of exorbitant costs to food processors and breweries for wastewater treatment surfaced earlier this year, prompting the Petaluma City Council to discuss the matter at its annual goal setting session in February. After several businesses threatened to leave Petaluma if a cheaper solution did not present itself, the council told city staff to pursue solutions. St. John immediately began soliciting local consulting firms to assess operations at the three-year-old, $120 million plant.

“During our hiring process, we discovered that Petaluma's industrial users generate approximately 40,000 gallons of high density waste every day,” said St. John. “That's roughly 12 huge tanker-truck loads that are driven to Oakland — where they have a methane digester — every day. That means costs to the businesses, wear-and-tear on our roads and damage to the environment through greenhouse gas emissions.”

© The Press Democrat |  Terms of Service |  Privacy Policy |  Jobs With Us |  RSS |  Advertising |  Sonoma Media Investments |  Place an Ad
Switch to our Mobile View